Monday, January 31, 2011
Downstairs frames done...
The boys have worked through a very hot morning and have all the frames erected for the downstairs area of the house along with the support beam in the garage. Our Electrician also has the meter box and underground power connected.
Saturday, January 29, 2011
The frames have arrived....
After a cruise past the block on Friday I discovered the frames and trusses were delivered. A phone call from our building supervisor soon after revealed that the boys will be on-site Monday morning to start erecting the frames. I will update the photos as we progress. Slowly getting rid of about 200 tonnes of soil, next week it will be all gone. Our sparky should have the power connected early next week......
Thursday, January 13, 2011
Near Maps Link
http://www.nearmap.com/?q=Pacific%20Dunes@-32.764425,151.874936&ll=-32.76327,151.875408&z=17&t=n&nmd=20101125
Copy and paste this link into your internet address box for the latest aerial photos.
Copy and paste this link into your internet address box for the latest aerial photos.
Monday, January 3, 2011
Tidy up