Friday, February 18, 2011

Frames and Trusses


After returning from our Honeymoon, the boys have been very busy. The flooring upstairs is all done, the frames and some trusses are in place, the rear deck area has the bearers and piers in place. The downstairs windows are in with the upstairs ones ready, (although we are getting the lower floor ones moved 300mm lower) The bricks, sand and cement has all arrived. The front deck floor was being done as we left. Another visit on Saturday and we will post some more photos.